Pharma
- What applies
- EU GMP Guide Annex 15 governs qualification and validation, for sterile medicinal products Annex 1 in addition.
We support Verification and Validation from design verification to process validation with IQ, OQ and PQ, planned to ISO 13485:2016 and the GMP requirements. Where a test case does not point clearly to a design input or process specification, the review examines the traceability gap instead of the product.
Overview
Design V&V and process validation across pharma, biotech, MedTech & IVD · ISO 13485:2016, GMP (IQ/OQ/PQ), 21 CFR Part 820
Last updated: September 18, 2026
Verification and validation are not a final test campaign, but a continuous body of evidence: verification demonstrates that the product or process meets the defined requirements; validation demonstrates that the intended use is achieved under real-world conditions.
Industries
Services
V&V master plan for product development or production with a defined scope, responsibilities, acceptance criteria and schedule. Deliverable: an approved master plan that maps the V&V activities to the regulatory requirements under ISO 13485:2016.
Impact assessment for process changes, supplier changes or site relocation. Deliverable: a documented assessment with a targeted revalidation scope that covers the changed area, without indiscriminately revalidating intact processes.
How we work together
Verification and validation turn on the acceptance criteria, and those are too often written after the test. The V&V plan must be in place before the first protocol is executed, because it derives the acceptance criteria from the design inputs and process requirements.
Only then can a traceability matrix be built that traces every test case unambiguously back to a requirement.
A team that tests first ends up with a matrix that is backfilled after the fact. The review by the notified body under EU 2017/745 (MDR) or the inspection against GMP requirements takes hold at the unsupported or duplicate links.
The next gap opens up between verification and validation: for processes whose output cannot be fully verified by end-of-line testing, such as sterilization, filling and welding, Annex 15 of the EU GMP Guide requires process validation with IQ, OQ, PQ.
With every subsequent change, an impact assessment determines the revalidation scope, so that the changed area is covered without indiscriminately revalidating intact processes.
Our approach
Step
Result
V&V planning
Approved V&V master plan with scope, acceptance criteria and responsibilities, derived from design inputs and process requirements.
Build traceability
Traceability matrix that links every requirement to a specific test case before protocols are executed.
Execute verification & validation
Executed design V&V and process validation protocols (IQ, OQ, PQ) with documented results against the acceptance criteria.
Review & approval
Reviewed and approved V&V reports, deviations assessed and closed out.
Change control & revalidation
Impact assessment per change, targeted revalidation scope defined and executed.
Common pitfalls
The V&V plan is not created until development is nearly complete.
By then, design inputs and acceptance criteria can no longer be derived cleanly, and the test campaign measures against assumptions rather than against defined requirements. This is the most common reason why V&V evidence fails to hold up in an audit.
Traceability between test cases and design inputs is missing or constructed after the fact.
The notified body under EU 2017/745 (MDR) requires an unbroken link between every requirement and its evidence; a matrix backfilled in hindsight is exposed by unsupported or duplicate links.
Process validation is reduced to end-of-line testing.
For processes such as sterilization, filling or welding, whose output cannot be fully verified, Annex 15 of the EU GMP Guide requires validation with IQ, OQ, PQ. A passed final test does not replace it.
Verification and validation are treated as equivalent.
If you only verify that specifications are met, you are missing the validation step that ISO 13485:2016 requires.
Revalidations are forgotten or rolled out indiscriminately across the entire production.
Without an impact assessment, either a relevant change goes unrevalidated, or unnecessary effort is incurred for processes that are not affected by the change at all.
Product Development & Regulatory Strategy
In a first call we assess your situation and say what needs clarifying first in your case. Without obligation, reply usually within one working day.
FAQ
Image notice: The images on this page were generated using artificial intelligence. They do not depict real people, places, or events.
Life Science Journal
New requirements, authority decisions and practice notes. Once a month, unsubscribe any time.
Projects from this industry
Related insights
All insights →Design Controls →
Design V&V as part of the design controls chain in product development
Process Validation →
IQ, OQ, PQ and revalidation of manufacturing processes in detail
Computer System Validation (CSV) →
CSV as a specific V&V domain for computerised systems
Annex 1 (Sterile Manufacturing) →
Validation of sterile processes per Annex 1 of the EU GMP Guide
Briefly outline your situation. We'll respond with an initial assessment, usually within one business day.
Prefer direct? +49 89 4161170-0
info@theentourage.de