Improving Overall Supply Chain Effectiveness at a Medical Device Manufacturer

  • +30% delivery planning
  • +20% warehouse and inventory planning

Medical device manufacturer with production- and procurement-side interfaces across the supply chain

Optimizing overall supply chain effectiveness at a medical device manufacturer, from demand planning and supplier management through to inventory control.

The challenge

The situation

The medical device manufacturer was struggling with high inventory levels, poor on-time delivery performance, and a lack of integrated planning and information processes across all interfaces. In addition, the existing procurement processes were not aligned with production capacities and actual demand. Resource planning and control were also inefficient, and performance transparency was poor.

Our approach

How Entourage approached it

01

Establishing cross-functional management control loops and central governance via a balanced scorecard for overall supply chain effectiveness (OSE)

02

Implementing a cross-functional communication process, because planning was breaking down precisely at the interfaces.

03

Optimizing material flow through value stream mapping

04

Improving supplier management and service level agreements

05

Managing resource, warehouse and inventory planning, so that procurement, production capacity and actual demand fit together.

The outcome

What changed

Within 6 months, supply chain efficiency rose by 15 percent. Planning, supplier management, and inventory control became transparent and manageable.

  • +30% delivery planning

    Delivery planning increased by 30 percent through the optimized processes.

  • +20% warehouse and inventory planning

    Warehouse and inventory planning increased by 20 percent.

  • Greater transparency and flexibility

    Increased transparency, better demand forecasting, resource planning, flexibility, and communication management.

Your next step

What this topic involves and how we work is set out on the topic page.

Supply Chain Management →

To start, the On-site Quick Check brings us to your site for one to three days to check the current state.

About the On-site Quick Check →

Image notice: The images on this page were generated using artificial intelligence. They do not depict real people, places, or events.

Your project

A comparable project?

Briefly outline your situation. We'll respond with an initial assessment, usually within one business day.

Prefer direct? +49 89 4161170-0
contact@theentourage.de

  • Reply usually within one working day
  • 3 locations: DE · CH · IT · projects in the US too
  • 100% life sciences