Case studyPharma

Cost Optimization of Tablet Production

  • 30% lower production costs

Pharmaceutical company with in-house tablet production

Tablet production was to become significantly more cost-efficient without jeopardizing quality and compliance.

The challenge

The situation

The company wanted to optimize its tablet production across a global manufacturing network spanning several continents to achieve significant cost reductions. Smaller batch sizes had greatly reduced production capacity, several supply bottlenecks occurred in individual product groups, and a series of ad-hoc measures disrupted load distribution. The central challenge was to tighten production workflows while maintaining quality and compliance, based on a review of workflows, cost structures and resource allocation.

Our approach

How Entourage approached it

01

Reallocation of the production portfolio, so that the cost reduction does not come at the expense of quality and compliance.

02

Adjustment of the shift model to actual demand

03

Analysis of the cost structure of tablet manufacturing as the basis, before anything was changed in the workflows.

The outcome

What changed

Tablet production runs at 30 percent lower cost with maintained quality and compliance, achieved within four months.

  • 30% lower production costs

    Reduction in the production costs of tablet manufacturing.

  • Four months to target

    Cost targets achieved within four months.

Your next step

What this topic involves and how we work is set out on the topic page.

Lean Manufacturing →

To start, the On-site Quick Check brings us to your site for one to three days to check the current state.

About the On-site Quick Check →

Image notice: The images on this page were generated using artificial intelligence. They do not depict real people, places, or events.

Sources
  • Entourage project experience (anonymized)

Your project

A comparable project?

Briefly outline your situation. We'll respond with an initial assessment, usually within one business day.

Prefer direct? +49 89 4161170-0
contact@theentourage.de

  • Reply usually within one working day
  • 3 locations: DE · CH · IT · projects in the US too
  • 100% life sciences