OEE and Output Improvement for a Pharma and Medtech Manufacturer
Pharma and medtech manufacturer with manual assembly
A pharma and medtech manufacturer struggled with high downtime in largely manual assembly processes, resulting in output that fell short of market demand.
The challenge
The situation
A pharma and medtech manufacturer suffered from high downtime and loss times in its largely manual assembly processes, resulting in output that fell short of market demand. A lack of resource planning and ineffective bottleneck management further compounded the production inefficiencies.
Our approach
What we delivered
Structured OEE measurement and control with systematic root-cause analysis for downtime
Resource planning and workforce flexibilisation through cross-training programmes
Integrated production management with communication loops and coordinated planning tools for bottleneck control
The outcome
Results & impact
20% more production output
Increase in production output of 20 percent.
1 sustainable change mentality
Performance-oriented change culture established across the organisation.
0 unplanned downtime
Unplanned downtime significantly reduced through structured root-cause analysis.
3 process improvement initiatives
Optimisation, process improvement and cost reduction implemented as initiatives.
In summary
The manufacturer increased production output by 20 percent and established a sustainable, performance-oriented change culture, with unplanned downtime significantly reduced.
Related expertise
Lean Manufacturing →
Systematic root-cause analysis of downtime and a 20 percent increase in production output in largely manual assembly processes are classic lean manufacturing levers for raising efficiency.
Continuous Improvement Programs →
The three initiatives implemented - optimisation, process improvement and cost reduction - together with the performance-oriented change culture established in the organisation show how continuous improvement becomes sustainably embedded.
Lean Six Sigma →
Structured OEE measurement and control with systematic root-cause analysis of downtime follows the data-driven root-cause methodology used in the Lean Six Sigma approach.
Manufacturing & Supply Chain Management →
Resource planning with cross-training of the workforce and integrated production management with coordinated planning tools for bottleneck control are core components of effective production management across the manufacturing chain.
Similar projects
More on Pharma →Sources
- Entourage project experience (anonymised)
Your project
A comparable project?
Briefly outline your situation. We'll respond with an initial assessment, usually within one business day.
Prefer direct? +49 89 4161170-0
info@theentourage.de
- Reply usually within one working day
- 4 offices: DE · CH · IT · US
- 100% life sciences