Skip to content
Entourage
Case studyPharma

Lean Six Sigma in Sterile Filling and Packaging

  • +20% OEE

Pharmaceutical company with sterile filling and packaging at one manufacturing site

Implementing Lean Six Sigma in the sterile filling and packaging operations of a pharmaceutical company, focused on cost reduction and a global lean program.

The challenge

The situation

The initial objective was to reduce costs at the site and to deliver a global lean implementation program. Lean elements had previously been introduced only partially and in a fragmented way. An inefficient continuous improvement process and a large number of disruptions were identified. On top of this came inadequate resource planning, unrealistic process standard times, and a lack of employee involvement.

Our approach

How Entourage approached it

01

Establish OEE measurability for all production lines, because without a shared metric neither losses nor progress were comparable.

02

Reduce disruptions through more efficient cleaning processes, after the volume of disruptions in the initial state had been identified as high.

03

Lean Six Sigma improvements for higher process stability

04

Introduce resource-based planning in place of the inadequate resource planning with unrealistic process standard times.

05

Sustainable process control through KPIs and key-data reporting that keeps process planning and efficiency management permanently visible.

The outcome

What changed

Within 12 months, overall equipment effectiveness (OEE) rose by 20 percent. Process planning and efficiency management became transparent and sustainably manageable.

  • Improved process standards

    Further development of the process standards and the management framework at the site.

  • Reduced losses

    Reduction of organizational and technical losses along the production lines.

  • Greater transparency

    Transparency in process planning, key-data reporting, and efficiency management.

  • +20% OEE

    Increase in overall equipment effectiveness (OEE) by 20 percent within 12 months.

Your next step

What this topic involves and how we work is set out on the topic page.

Lean Six Sigma →

To start, the On-site Quick Check brings us to your site for one to three days to check the current state.

About the On-site Quick Check →

Regulations & standards considered

  • EU GMP Annex 1 (sterile manufacturing)

Image notice: The images on this page were generated using artificial intelligence. They do not depict real people, places, or events.

Your project

A comparable project?

Briefly outline your situation. We'll respond with an initial assessment, usually within one business day.

Prefer direct? +49 89 4161170-0
contact@theentourage.de

  • Reply usually within one working day
  • 3 locations: DE · CH · IT · projects in the US too
  • 100% life sciences