We support Research, Development and Engineering across the lifecycle: feasibility study, design controls under ISO 13485:2016, usability under IEC 62366-1 and software under IEC 62304. Linking requirements, risk management under ISO 14971 and evidence planning only shortly before approval means rebuilding traceability backwards.
Overview
Support from the feasibility study through verification & validation · ISO 13485:2016 Section 7.3, FDA 21 CFR Part 820 (QMSR), IEC 62366-1:2015, IEC 62304, ISO 14971
Last updated: October 3, 2026
Research, development and engineering in pharma, biotech, MedTech and IVD are not a free space for invention, but a process whose evidence must be generated from the outset. In practice, projects rarely get stuck on the technology, but on the missing integration of requirement, risk and evidence.
Industries
Services
How we work together
In regulated development, every discipline depends on what the previous one has already fixed. The feasibility study determines which regulatory pathway and which evidence needs apply; from these arise the design inputs, which under ISO 13485:2016 Section 7.3 and FDA 21 CFR Part 820 (QMSR) must be traceable through to the verification record.
Software under IEC 62304, usability under IEC 62366-1:2015 and biocompatibility under ISO 10993-1:2025 are not parallel strands here, but inputs into the same risk management under ISO 14971. A project that ties one of these strands to traceability too late turns it into the bottleneck, usually clinical performance for IVD or the evidence that identified risks were actually verified.
verification tests against the design inputs, validation against the user needs, and both hang on the same design and development file, which must be available as a coherent whole at an FDA inspection under 21 CFR Part 820 (QMSR).
Reconstruct this archive at the end instead of maintaining it continuously, and the audit finds the traceability missing, which holds up the project.
Our approach
Step
Result
Feasibility & Pathway Assumptions
Documented feasibility report covering technical feasibility, regulatory pathway and evidence needs as the basis for the design inputs.
Design Inputs & Traceability
Complete, verifiable design inputs derived from the user needs; traceability matrix established and linked to risk management under ISO 14971.
Engineering & Risk Assessment
Design outputs, software under IEC 62304 and usability under IEC 62366-1:2015 developed; biocompatibility assessed under ISO 10993-1:2025.
Verification
Evidence that the design outputs meet the design inputs; verification protocols linked in the traceability matrix.
Validation & Performance Evidence
Validation against the user needs; for IVD, performance evaluation under EU 2017/746 consolidated in the Performance Evaluation Report.
Design Transfer & Documentation
Handover to production with qualification under EU GMP Guide Annex 15; design and development file complete and inspection-ready.
Common pitfalls
Traceability is reconstructed only shortly before approval.
If you do not continuously maintain the link from user needs through design inputs to the verification record, you end up building the design and development file under ISO 13485:2016 Section 7.3 backwards; this is the most common reason for findings in inspection and audit.
Risk management and development run in parallel instead of interlocked.
Software under IEC 62304 and usability under IEC 62366-1:2015 generate their own risks; if these are not fed back into risk management under ISO 14971, a gap arises between the identified risk and the verification record.
Biocompatibility testing starts without chemical characterization.
Testing all biological endpoints across the board under ISO 10993-1:2025, instead of governing them through the characterization under ISO 10993-18, ties up time and material on tests that the risk process does not even require.
V&V is planned against the wrong reference.
Verification tests against the design inputs, validation against the user needs; if the two are conflated, the evidence that the product meets the original need is missing in the end; a recurring gap under ISO 13485:2016 Section 7.3 and FDA 21 CFR Part 820 (QMSR).
For IVD, clinical performance is addressed too late.
The performance evaluation under EU 2017/746 rests on three pillars; scientific validity and analytical performance are often in place, while clinical performance remains an open evidence gap and holds up the Performance Evaluation Report.
Product Development & Regulatory Strategy
In a first call we assess your situation and say what needs clarifying first in your case. Without obligation, reply usually within one working day.
FAQ
Image notice: The images on this page were generated using artificial intelligence. They do not depict real people, places, or events.
Life Science Journal
New requirements, authority decisions and practice notes. Once a month, unsubscribe any time.
Latest insights
All insights →Design Controls →
The control process under ISO 13485:2016 Section 7.3 and FDA 21 CFR Part 820 (QMSR) in detail
Verification & Validation →
V&V plans and qualification as evidence of conformity
Usability Engineering →
Usability under IEC 62366-1:2015 as a risk source in its own right
IVD Performance Studies →
Performance evaluation under EU 2017/746 with the three pillars of evidence